What the Dutch Warm Assendorp case reveals about sizing heating and cooling networks for a changing climate and a renovated building stock
When designing a district heating and cooling (DHC) network, the question that most shapes the entire design is: what thermal demand must the network cover? From that starting point, capacities, simultaneity factors and losses are defined, leading to the determination of the most viable thermal generation plant(s) and renewable energy mix for the system. This in turn informs the first cost estimate, the business model and stakeholder engagement, all the way through to the final design and construction. Each stage of the process is contingent on the initial question: what is the thermal demand that the network will need to meet over its lifetime? This is where things get difficult.
The era of relatively stable energy demand from one year to the next is now over. Weather patterns have always been a contributing factor to interannual variation, but, unfortunately, the consequences of anthropogenic climate change make it highly unlikely that this stability will be restored, as the graph below shows.
Designing the network on the basis of current or historical thermal demand can therefore lead to design errors and, no less importantly, to errors in the economic feasibility assessment of the project.

The figure above shows the daily global surface air temperature for every year since 1940. In each of the last four years (2023 to 2026), temperatures have been well above the 1991–2020 average (dashed line) for most of the year, while 1990, a normal year at the time, now sits below it. The “reference” climate on which most design data are still based no longer describes the conditions in which networks will operate.
How significant is the impact of climate change?
Let us consider the Warm Assendorp case study in MUSE-DHC, which is currently being developed in Zwolle, the Netherlands. Four climate scenarios were analysed: two based on historical climate (typical meteorological years, TMYs) and two based on future climate (future meteorological years, FMYs) derived from IPCC projections:
- TMY 1991–2020
- TMY 2006–2020
- FMY RCP8.5 – 2050
- FMY RCP8.5 – 2080
RCPs (Representative Concentration Pathways) are the greenhouse-gas scenarios used by the IPCC. The number indicates the additional radiative forcing, in W/m², reached by 2100. RCP2.6 is a strong-mitigation pathway, broadly consistent with keeping global warming below 2 °C. RCP4.5 is an intermediate pathway and RCP8.5 is a high-emissions pathway with little additional climate policy.

Heating degree days (HDD) and cooling degree days (CDD) are indicators that summarise, in a single figure, how cold or warm a climate is and, therefore, how much heating or cooling buildings in that climate are likely to need over a year.
Each day, a comparison is made between the mean outdoor temperature and a base temperature. Should the temperature be colder than the base, the difference is added to the HDD. If it is warmer, it is added to the CDD. The daily values are then summed over the year:
- HDD18: base temperature of 18 °C. A day with a mean temperature of 8 °C contributes 10 heating degree days.
- CDD24: base temperature of 24 °C. A day with a mean temperature of 28 °C contributes 4 cooling degree days.
The higher the HDD value, the greater the heating requirement. Similarly, the higher the CDD value, the greater the cooling requirement. Therefore, both indicators are well suited to the comparison of climates or future scenarios. In Zwolle, HDD decreased and CDD increased towards 2080 (Figure 2).
The data indicate a significant decrease in heating requirements and an increase in cooling needs. While cooling demand remains low in absolute terms, it might be argued that it is too low to justify installing a standalone cooling system.
However, climate data alone does not tell the whole story. Degree days describe only the outdoor temperature. They ignore solar and internal gains, humidity, thermal mass and, above all, the quality of the building envelope, so buildings exposed to the same climate can have very different demands. The subsequent stage is to examine the resulting energy demand of the buildings themselves. The building simulation covered seven weather files: the two historical TMYs, the actual weather recorded in 2025, and future weather files for 2050 and 2080 under three emissions pathways (RCP2.6, RCP4.5 and RCP8.5).

Building energy demand also follows the same trend. Under the most pessimistic scenario (2080 RCP8.5), heating demand decreases by around 30% relative to the baseline (1991–2020 TMY), while cooling demand increases by 161%.
The results based on observed weather in 2025 are even more striking. The simulated cooling demand (2,195 kWh per building) exceeds both the 2050 RCP4.5 value (1,566 kWh) and the 2080 RCP4.5 value (1,801 kWh). According to the RCP8.5 scenario, this level is not expected to be reached until around 2043. In terms of heating, the demand simulated using 2025 weather is on par with the level projected for 2046 under RCP4.5.


The simulated cooling demand includes latent loads, which become increasingly relevant as buildings are retrofitted. Envelope retrofit reduces sensible loads but leaves latent loads practically unchanged, so the latent share of the total cooling demand grows and humidity control becomes the dominant issue at part load, when sensible cooling demand is low or absent. Equipment capacities and supply temperatures calculated only from air temperature and peak sensible loads may therefore be inadequate, and designers should also assess dehumidification needs, especially in climates with balanced demand for heating and cooling.
Projections may still fall short
It is important to note that a single year does not define a climate, and 2025 was a warm year. Even so, some future weather files may underestimate cooling demand. Several future scenarios are projected to result in reduced cooling demand compared to recent historical levels. Specifically, the 2080 RCP2.6 (1,396 kWh) and 2050 RCP4.5 (1,566 kWh) scenarios both fall below the 2006–2020 TMY (1,608 kWh). Optimistic scenarios should therefore be used with caution. They depend on emissions reductions that have not yet materialised, and the cooling demand simulated using observed 2025 weather already exceeds their projections.
The hourly results demonstrate a consistent gap. The highest cooling peaks in the simulations are seen in the 2006–2020 TMY and in 2025, rather than in 2080 RCP8.5, whose peaks are around 30% lower in the most demanding buildings. In other words, a network sized with the most extreme future weather file would have less cooling capacity than the buildings already need today, because pipes, substations, chillers and storage are sized for peak loads, not for annual demand. The reason lies in how future weather files are built. They are commonly generated by a technique known as morphing, which shifts and stretches an hourly historical weather file so that its monthly averages match those projected by climate models for the target period. As a consequence, the peaks that determine the sizing of pipes, substations and chillers may be underestimated if only morphed future files are used. For district heating and cooling projects, this means that cooling peaks should be checked against recent observed extremes and not taken from future weather files alone.
Some risks are only partially represented in standard future weather files. The Atlantic Meridional Overturning Circulation (AMOC), the system of ocean currents that carries heat towards north-western Europe, is projected to weaken during this century. This gradual weakening is included in future weather files only implicitly because it emerges from the ocean component of each coupled global climate model (GCM). Most CMIP5/CMIP6 models simulate a gradual weakening, which shows up in their North Atlantic temperatures. The EURO-CORDEX regional models, in turn, simulate only the atmosphere and take sea surface temperatures from the driving GCM, so whatever weakening the GCM produces is passed on to the regional deltas and then into the morphed files. The files therefore reflect AMOC weakening only to the extent that the selected models simulate it, averaged over each month.
These files omit abrupt AMOC collapse and other tipping-point scenarios. The IPCC considers such a collapse before 2100 unlikely, although recent studies suggest the risk may be higher than previously thought. A collapse could bring markedly colder winters to the region even if summers continue to warm. For DHC design, this is a further reason not to reduce heating capacity in anticipation of milder winters.
Consequently, relying on a single climate scenario to design a district heating and cooling network can leave it undersized for some conditions.
Envelope renovation: buildings before and after renovation
Climate change clearly has a major impact on design, but another factor has an even greater one: the energy renovation of the building stock.
The recast Energy Performance of Buildings Directive (EPBD) calls for the renovation of Europe’s building stock. How will this renovation affect the demand that district networks must cover?
In the MUSE-DHC case study in Zwolle, a building of the largest typology studied requires approximately 171 MWh of heat per year if it was built before 1964, whereas one built after 2015 requires 28 MWh, 84% less. Older, poorly insulated buildings require a greater amount of energy overall and set the high supply temperatures around which conventional networks are designed.
As building insulation improves, the demand for heating and cooling will converge. According to the 1991–2020 TMY, the older buildings require approximately 80 times as much heating as cooling, while the newer buildings require only around four times as much. Under the 2080 RCP8.5 scenario, the newer buildings require less than twice as much heating as cooling. Better insulated and more airtight buildings also shed heat less easily, so their cooling demand is the highest of all construction periods.
Renovation takes this further. A 104 m² single-family house was modelled in its current state and after renovation to the Passivhaus standard:
- Current envelope, 1991–2020 TMY: 43.0 kWh/m²·year of heating and 1.9 kWh/m²·year of cooling, a ratio of about 23:1.
- Current envelope, 2050 RCP8.5: 35.6 kWh/m²·year of heating and 3.1 kWh/m²·year of cooling, about 11:1.
- Renovated envelope, 2050 RCP8.5: 11.8 kWh/m²·year of heating and 10.3 kWh/m²·year of cooling, almost 1:1.
Peak loads also change. The renovated house’s heating peak falls from approximately 48 to 26 W/m², while its cooling peak rises from around 32 to 46 W/m² and the number of cooling hours increases by more than 100%. Cooling becomes the sizing load.

How to design and efficient DHC network
It is important to note that there is no single, universal answer that applies to every case. The results of the MUSE-DHC analysis for Zwolle presented above point to a set of design principles that help to mitigate the risk of oversizing heating, undersizing cooling and misjudging the project’s economics. As a result of the MUSE-DHC analysis, we recommend that developers of community-led heating and cooling networks take the following steps:
- Design for a range of futures, not a single demand figure. Thermal demand should be assessed against several sets of weather data (historical TMYs, recent observed years and FMYs under different emissions pathways) and several renovation trajectories, and the design should be tested for robustness across all of them.
- Check peak loads against recent extremes. Because morphed future weather files raise averages without generating new heatwaves, cooling peaks should be verified against recent extreme years such as 2025 as well as long-term projections.
- Size heating and cooling differently. Heating capacity can reasonably be based on current demand, since heating demand is expected to decline with both climate warming and renovation, while cooling capacity and the associated network components should anticipate the most demanding projections.
- Account for the renovation pathway of the connected building stock. As the EPBD drives deep renovation, demand will fall substantially and become more balanced between heating and cooling. This enables lower supply temperatures and favours low-temperature and fifth-generation (5GDHC) concepts, in which heat can be exchanged between buildings with simultaneous heating and cooling needs.
- Build in modularity and phasing. Modular generation plant, staged capacity additions and pipe sizing that leaves headroom for future cooling allow the network to adapt as demand evolves, reducing the risk of stranded assets.
- Reflect demand uncertainty in the business case. Feasibility studies should include sensitivity analyses across demand scenarios, since a shift from heating-dominated to balanced or cooling-dominated demand changes the revenue structure, the tariff design and the optimal generation mix.
The central question is how much heating and cooling the network will need to deliver over several decades of operation. In order to answer this question, it is necessary to combine climate projections, recent observed extremes, and building-stock renovation scenarios from the earliest stages of design.
Article by the MUSE DHC partners Xavier Gallart Aliu and Jesús Teixidor Graugés, SUNO Enginyeria de Serveis Energètics